First of all, putting aside those public keys (if too many people use them, they will definitely be blocked), I prefer open source tools! Because open source means security (no backdoors, no bundling), after ensuring security, what we need is success rate and permanence. Generally OK. 1: pt, batch head (pt) is a kind of material coding in ERP system, 2: pto——product to order order picking, that is, the product is produced first and shipped after receiving the order; inventory with this attribute is mainly used for business documents and simulated quotation functions in production and manufacturing. What are the differences in demand management under different production types (mts, ato, mto, eto)? Many bosses think that spending millions on ERP can solve these old problems. But the reality is - why? Because the production model is not selected correctly, ERP is just.
ATO cooler. I tried. Ato cooler, Cooler, Frat